Gujarat State Electricity Corporation Limited - Live supply of feed circuit isolating valve (fcv) spares for boiler unit no, 3,4&5 at gsecl ukai tps.(bmd-3&4) 1. stem for 12''(300mm) size 2500 class bhel make feed circuit isolating gate valve.
Gujarat State Electricity Corporation Limited Ukai Thermal Power Station THERMAL POWER STATION UKAI DAM DIST - TAPI 394680 Rate contract (valid for 11 Months) for removing, lifting, shifting, dismantling and overhauling of 6.6 KV HT motors ID/FD/PA Fan/Coal Mill/ DMCW/ CEP / CW / AIR COMP./ BCN/ Crusher of Unit No. 6 Ukai
Apr 29, 2019· GSECL has successfully completed Energy Efficiency Renovation & Modernisation (Turbine retrofitting & boiler back pass modification) of its 200/210 MW LMZ unit at Ukai TPS & Wanakbori TPS respectively during the year 2017-18. Post R & M, substantial improvement in Efficiency of these units has been observed.
Description : Supply of Lub oil pump (LOP) LT motors for ID/FD/PA fan, APH Guide & Support bearing, coal mill of 1x500MW,Unit#6, GSECL TPS Ukai. Reference No. : T – 4109 Urja RFQ No. : 32926 Sr. No. Description of materials with details of Specifications Quantit y Require d UOM Quantity Offered by Tenderer Unit Ex- Works In Rs.
Supply Of Hot Air Shut Off Gate Plate & Conventional Inner Cone For Coal Mill Unit 3,4&5 At Gsecl Ukai Tps.(bmd-5) The cone is configured so that pulsed air is evenly distributed top to bottom along the outer pack of the filter and down through the inner cone pack.
For meeting new environmental norms, the GSECL has completed ESP Refurbishment of Ukai TPS Unit no 3 to 5 (total 610 MW capacity) & Wanakbori TPS Unit no .
Gujarat State Electricity Corporation Limited :: ... Supply of MS fabricated grills for Boiler unit No.6 GSECL Ukai TPS.(BMD-6) Estimated Contract Value - 8,37,304.00 ... Repairing / replacement of PA/SA ducts and seal air pipes & headers for coal mill XRP-783 of unit .
Gujarat State Electricity Corporation Limited (GSECL), is a company promoted in 1993by Gujarat ... and decommissioning of existing 2x120 MW units at Ukai Thermal Power Station of GSECL. The ... the Gross Station Heat rate of 2150 kcal/ kwh and design coal for the unit of 800 MW is around 3.34 Million Tonnes per Annum (MTPA). ...
Free View of Gujarat State Electricity Corporation Limited Tenders.GSECL Tenders. View Latest Gujarat State Electricity Corporation Limited Tenders. ... Emulsifier Pipe Line And Fabrication Work At Unit No. 3 To 6 Gsecl Tps Ukai.(work Shop) Estimate (INR ... Supply Of Mill Side Liner Set For Coal Mill Xrp-803 At Stage-ii At Wtps. Estimate (INR ...
GSECL Supply Of Hot Air Shut Off Gate Plate Conventional Inner Cone For Coal Mill Unit 3 4 5 At Gsecl Ukai Tps Bmd 5 Open, Due Date: 26/08/2019,Tender Value: 918765, .
Wanakbori Thermal Power Station is a coal-fired power station in Gujarat, India.It is located on the bank of Mahi river in Kheda district. There are eight units at this location, sevenof each 210 MW and one of .
Ukai TPS unit-6 was first unit in GSECL having a capacity more than 500 MW. Transport. It is on the Jalgaon-Surat branch line of Western Railway.Coal-based thermal power stations consume large quantities of coal. For example, the Ukai Thermal Power Station consumed 3,200,000 tonnes of coal in 2006-07. Around 80 per cent of the domestic coal supplies in India are meant for coal based thermal ...
GUJARAT STATE ELECTRICITY CORPORATION LIMITED Ukai Thermal Power Station, Ukai Dam, Taluka Fort Songadh, DistTapi– 394680. Ph. 91-2624-233215, 233257 Fax: 91-2624-233300, 233315e-mail: ukaiceg@gebmail Website: T –3851 Tender for the Supply of Various Size Orifice of Coal Mills Unit No. 3, 4 & 5 of Ukai TPS.
Gujarat State Electricity Corporation Limited Ukai Thermal Power Station THERMAL POWER STATION, UKAI DAM, DIST - TAPI - 394680 TECHNICAL BID Reference No.: T – 4117 Subject : Supply of various fastners for XRP 1003 Coal Mill of unit-6 atGSECL TPS Ukai. Sr. No. Description of Material Qty. Required Unit 1 M20X75 ALLEN BOLT 50 Number
Free Online Library: Supply Of Ceralined Mill Discharge Body For Coal Mill Xrp-763/783 Of Boiler Unit No.3,4&5 Gsecl Ukai Tps.(bmd-5). by "Mena Report"; Business, international Heating Equipment and supplies Heating equipment Resveratrol
Gujarat State Electricity Corporation Limited Ukai Thermal Power Station THERMAL POWER STATION, UKAI DAM, DIST - TAPI - 394680 TECHNICAL BID Reference No. : T –4170 Subject : Supply of various types High Tensile Fasteners for coal Mill of Unit Nos. 3, 4 & 5 at GSECL TPS Uka i. Sr. No. Description of Material Qty. Required Unit
Ukai Thermal Power Station - Howling Pixel. Ukai TPS unit-6 was first unit in GSECL having a capacity more than 500 MW. Transport. It is on the Jalgaon-Surat branch line of Western Railway.Coal-based thermal power stations consume large quantities of coal.
Coal Mill at GTPS Fail to execution of order 4 M/s. Jagrut.V.Patel, At- Rasulpura, PO_ ... Details of Stop Dealing / Black listed as on DT. 01.10.2019. Of GSECL. Sr.No Factory Address Stop Deal/Black ... GSECL (Ukai) Supply of coal nozzle spares & hot air shut off gate plate & suppluy of conveyors
Description : Supply of 8"(200NB) BORE DIA CYLINDER VITON SEAL KIT FOR COLD AIR ISOLATING GATE OF COAL MILL AT UNIT-6,GSECL UKAI TPS. Reference No. : T – 4125 Urja RFQ No. : 33050 Sr. No. Description of materials with details of Specifications Quantit y Require d UOM Quantity Offered by Tenderer Unit Ex- Works In Rs. Pkg. & Fwd.
WT- Page 5 of 19 SCHEDULE - A Name of work: Works for Fabrication of cage for deflector (classifier) blade of coal mill of boiler unit no.3.4& 5 at Ukai TPS.
Name of Work : Overhauling, servicing & commissioning of individual trolley of Coal Mill of Unit Nos. 3, 4 & 5 at GSECL Ukai TPS. SCOPE OF WORK BY PARTY (1) Preparations of necessary scaffolding for dismantling and refitting of trolley. (2) Party has to dismantle the trolley one by one from its position and shall be shifted at work place.
Power Plant. Sikka Thermal Power Station is located near Jamnagar, which is the major industrial town in Gujarat.There are two units of 120 MW capacity each.two 250 .
Tenders are invited for Supply of Ceramic coated Ventury with Neck for coal mill unit 3, 4 & 5 of GSECL Ukai TPS.(BMD-3 & 4) Estimated Contract Value(INR): 848,112.00 ( Eight Lacs Forty Eight Thousand One Hundred Twelve Only )
The Ukai Thermal Power Station is located near Ukai Dam on Tapi River in Tapi District. It is a Coal Based Power Station. The Installed Capacity of Station as on 31.03.2017 is 1350. There are two units of 120 MW each (Unit no. 1 & 2), two units of 200 MW each (Unit no. 3 & 4), one unit of 210 MW (Unit no. 5) and one unit of 500 MW (Unit no 6).